wind farm green hills

Pampa Renovável

Brazil

Pampa forecasts wind across 900 km of grassland.

27%

27%

27%

fewer imbalance fees

14

14

14

wind parks

Pampa operates 14 wind parks across 900 km of grassland in southern Brazil.

The challenge

Imbalance penalties ate into margins every month because national forecasts missed the region's fast frontal systems.

What they did

Hyper-local weather models trained on Pampa's own turbines cut forecast error by more than half.

The result

Imbalance fees fell 27%, and the forecasting team now covers twice the capacity with the same people.

wind turbines dusk

Forecast error used to be a line item. Now it’s a rounding error.

Forecast error used to be a line item. Now it’s a rounding error.

Rafael Lima

COO

terrane

Energy intelligence for the grid. Forecasts, dispatch and trading for operators who move power before the grid asks for it.

© 2026 Terrane Systems AS. Oslo, Austin and São Paulo

All forecasts operational

terrane

Energy intelligence for the grid. Forecasts, dispatch and trading for operators who move power before the grid asks for it.

© 2026 Terrane Systems AS. Oslo, Austin and São Paulo

All forecasts operational

terrane

Energy intelligence for the grid. Forecasts, dispatch and trading for operators who move power before the grid asks for it.

© 2026 Terrane Systems AS. Oslo, Austin and São Paulo

All forecasts operational

Create a free website with Framer, the website builder loved by startups, designers and agencies.